top of page
Suspension Bridge Cables

EBNI Australia

You Can Build Infrastructure With EBNI

Innovate with assurance using safe, responsible engineering, construction, and infrastructure solutions.

Our
Services

Bridge

Mixed-use building services tailored specifically for public projects. Handling planning, design, and construction; assisting clients in optimizing space; ensuring regulatory compliance; and delivering projects efficiently.

Expertly customizing our infrastructure solutions to meet public needs. Overseeing the planning, design, and construction of tunneling and rail work systems, roads, bridges, and other critical civil infrastructure.

Image by Davide Pietralunga

Multi-Disciplinary

Engineering Solutions for Involuted Projects

Through data-driven analysis, we optimise construction methods, forecast material requirements, and deliver infrastructure that meets human needs, supports long-term maintenance, and promotes lasting prosperity.

End To End Project Management 

From First Drawing to Occupation Certificate.

EBNI manages the full project lifecycle across three integrated phases, coordinating all disciplines, documentation, contractors, and certifications.

construction phase facade exposure

01. PLAN & APPROVE

From architectural drawings and Council planning approvals through coordinated structural, civil, hydraulic and fire documentation to Construction Certificate — ready to build.

02. PROCURE & BUILD

From tender-ready documentation and contractor appointment through procurement, site engineering and contract administration — EBNI coordinates quality, programme, cost, compliance and services integration across construction.

03. COMPLETE 

From inspections, testing and commissioning through defect rectification, final certifications and as-built documentation to Occupation Certificate — handed over ready for occupation.

Engineeirng Building & Infrastructure

Services We Provide

We deliver sophisticated structural analysis and design across concrete, steel, and composite systems—structures that safely carry every applied load while bridging bold architectural vision to life.

Assessment of earthworks and ground conditions to determine soil cohesion and inform slope stability solutions—spanning piling, excavation, anchoring, and foundations.

Underground services and pipeline networks—the foundation of modern roads, pavements, landscaped spaces, and civil infrastructure.

Engineeirng Projects Undertaking

THE NEWS

Stay up to date with the latest from Engineering Building & Infrastructure (EBNI) — from major infrastructure proposals like the Sydney Hybrid Bridge and Integrated Metro Corridor, to project milestones, industry engagements and company announcements. This is where we share our progress as we work to deliver innovative structural, civil and infrastructure solutions across NSW.

Image by Annie Spratt
Ranbow Bridge.png

EBNI Submits Sydney State Significant Infrastructure Proposal

Engineering Building & Infrastructure (EBNI) has formally submitted its unsolicited proposal for the Sydney Hybrid (SH) Bridge, a combined bridge and metro infrastructure initiative for Sydney. The multi-volume Strategic Report outlines the project's technical, financial, and delivery framework for consideration by relevant government agencies.

Metro Map.png

EBNI Reshapes Sydney’s Public Transport Philosophy & Infrastructure

Engineering Building & Infrastructure (EBNI) has formally submitted its unsolicited Sydney Hybrid Bridge (SH Bridge) proposal—a new harbour crossing connecting Balls Head/Waverton with Balmain/Rozelle, integrating an eight-lane road bridge with a protected future metro corridor.

​

The metro would connect Crows Nest–Victoria Cross with the Rozelle/Bays Precinct, extending Sydney’s rail network across the harbour and establishing a more integrated, future-ready approach to Sydney’s transport infrastructure.

​

EBNI’s multi-volume Strategic Report outlines the engineering, funding and delivery framework and is now with relevant NSW Government agencies for consideration

Podium.png

Balmain Metro Station Building Design Underway as Part of SH Bridge Project

As part of the Sydney Hybrid Bridge and Integrated Metro Corridor proposal, EBNI is currently developing the design for the Balmain-Ballet Metro Station building, which will serve as a passenger interchange and construction access point for the tunnel boring works. The station is planned to connect the southern end of the harbour crossing into the Balmain/Rozelle metro corridor, supporting future rail services into the Inner West. Design and engineering work on the station building is ongoing as the broader Strategic Report proceeds through government review.

Business Consulting

Stay In The Loop 

EBNI Project & Progress Intelligence Reports

  • EBNI has developed a State Significant Infrastructure proposal for a major integrated harbour crossing and metropolitan rail corridor to enhance Sydney’s long-term transport capacity, network resilience and connectivity. The proposal comprises a new high-capacity road bridge integrated with a dedicated future metro corridor, connecting strategic transport precincts across Sydney Harbour and extending through established metropolitan centres. The infrastructure is intended to provide additional cross-harbour capacity, support future public transport expansion and improve the integration of road and rail networks. The proposal incorporates major bridge, tunnel, civil, structural and transport infrastructure, supported by a multidisciplinary engineering framework covering feasibility, planning, environmental considerations, detailed design, construction and long-term infrastructure delivery.

  • This paper explores the design principles, mechanical behavior, material properties, and optimization methods involved in the development and analysis of cable-stayed bridges. Special attention is given to stay cable configurations, post-tensioning strategies, anchorage systems, and advanced failure analyses including non-linear and pushover techniques. A comprehensive literature review, analytical modeling, and practical design recommendations are provided to support future bridge truss system design and safety.

  • Composite steel–concrete pylon construction is examined, demonstrating mechanical advantages over traditional all-steel or all-concrete pylons—including enhanced stiffness, reduced construction time via modular prefabrication, and improved overall stability. Synthesizing recent research and case studies, the study distills design guidelines and safety considerations to inform future large-span bridge projects.

  • The combined findings advance the mechanistic understanding of TBM performance and provide design guidance for steering control, segment protection, and discharge efficiency. Moreover, by linking excavation tolerances to operational safety of subsequent rail systems, this research underscores the critical role of TBM modelling in delivering both construction efficiency and long-term transport reliability.

Ready to Build ?

Start your project with EBNI today.

Whether you have a site, an idea, or a tender — our engineers are ready to help you move forward.

GET IN TOUCH

Request a Consultation

Investor category
Indicative capacity per opportunity (AUD)

Existing property exposure, preferred sectors, timig, questions...

bottom of page